Research Article
BibTex RIS Cite

Risk Analysis and Success Levels of the Software Project Developed in Technocity

Year 2015, Volume: 3 Issue: 1, 57 - 75, 30.01.2015

Abstract

Software projects needed on almost every aspect of daily life, are growing and gaining more importance more and more every day. However, this software that growing raises a more complex structure. However, this software that growing is a more complex structure. In this context, analysis and control process and success levels of the software projects are wondered. Therefore, in this study, through the checklist in questionnaire developed, found in, is aimed to identify and analyze risk factors which encountered in the software project that performed in Technocity and to determine the levels the success of this project. For this purpose, the necessary data were collected, were identified software risk factors and this factors were analyzed. The descriptive analysis method was used for the analysis of the data obtained within research and Microsoft Excel 2010 and IBM SPSS Statistics 21.0 software. In addition, are included to analysis results and the level of success of the developed software in the study. According to results of research, particularly; was observed to be completed successfully the about 95% of software projects developed in Technopolis and delivered to the customer in spite of divergence in project duration, budget, personnel and objectives

References

  • Gürbüz, A. (2010) Yazılım Test Mühendisliği, Papatya Yayıncılık Eğitim, İstanbul, 31,34.
  • Yong. H., Xiangzhou. Z., Xin. S., Mei. L., Jianfeng . D. (2009) An Intelligent Model for Software Project Risk Prediction, International Conference on Information Management, Innovation Management and Industrial Engineering, ICIII, vol. 1, pp.629-632.
  • Tang. A., Wang. R. (2010) Software Project Risk Assessment Model Based on FuzzyTheory, Computer and Communication Technologies in Agriculture Engineering (CCTAE), 2010 International Conference On 12-13 June 2010, pp 328-330.
  • Robert. N. C. (1996) Large-Scale Project Management is Risk Management, IEEE Software.
  • Gülebağlan, S. (2006) Yazılım Geliştirmede Risk Yönetimi, Yüksek Lisans Tezi, Çanakkale Onsekiz Mart Üniversitesi, Fen Bilimleri Enstitüsü.
  • C.Ravindranath Pandian, "Applied Software Risk Management a Guide for Software Project Managers", Auerbach Publications, United States of America, 2007, Chapters 2,3,5.
  • Yudistira Asnar, Paolo Giorgini, "Risk Analysis as part of the Requirements Engineering Process" University of Trento, Department of Information and Communication Technology, 2007.
  • Bryan L. McKinney, David R. Engfer, "Formulating Risk into Research and Engineering Projects", Crystal Ball User Conference, 2004.
  • Proc. SEI Conf. Risk Management, Managing Uncertainty in a Changing World, Apr. 1997.
  • A.McKinlay VI, “Software System Safety Engineering,” Software Safety Eng. Course, June 1992.
  • U.S. Air Force, “Software Risk Abatement,”AFSC/AFLC Pamphlet 800-45, Sept. 1988.
  • L.L. Russo, “Software System Safety Guide,” U.S. Army Communications ElectronicsCommandreportCECOM-TR-92-2,May1992.
  • Neumann, D. E., An Enhanced Neural Network Technique for Software Risk Analysis. Donald E.Neumann. IEEE Trans. Software Eng. 28(9):904-912 (2002)
  • Standards Australia and New Zealand, Australian/New Zealand Standard (2004) Risk Management AS/NZS 4360:2004. 3rd Ed., Stds Australia/New Zealand.
  • Project Management Institute (2004) A Guide to the Project Management Body of Knowledge (PMBoK), 3rd Ed. ANSI/PMI 99-001-2004, PMI, Newton Square, PA.
  • Boehm, B.W. (1991) Software Risk Management: Principle and Practices, IEEE Software, Vol. 8, No. 1, January 1991.
  • Kajko-Mattsson, M., Nyfjord, J. (2008) State of software risk management practice, LAENG International Journal of Computer Science, November.
  • Li X., Liu S., Cai W., Feng S., "The Application of Risk Matrix to Software Project Risk Management," International Forum on Information Technology and Applications, IFITA, vol. 2, pp.480-483, 2009.

Teknokent’lerde Geliştirilen Yazılım Projelerinin Risk Analizi ve Başarı Düzeyleri

Year 2015, Volume: 3 Issue: 1, 57 - 75, 30.01.2015

Abstract

Günlük hayatın hemen her alanında ihtiyaç duyulan yazılım projeleri her geçen gün daha fazla büyümekte ve daha çok önem arz etmektedir. Bununla birlikte, büyüyen bu yazılımlar beraberinde daha karmaşık bir yapıyı doğurmaktadır. Bu bağlamda, sözkonusu yazılım projelerinin analiz ve kontrol süreci, ayrıca başarı düzeyleri merak edilmektedir. Dolayısıyla bu çalışmada, geliştirilen anket formlarında bulunan kontrol listeleri aracılığıyla, Teknokent’lerde geliştirilen yazılım projelerinde karşılaşılan risk faktörlerini belirlemek, analiz etmek ve bu projelerin başarı düzeylerini ortaya koymak amaçlanmıştır. Bu amaçla, gerekli olan veriler toplanmış, yazılım risk faktörleri belirlenmiş ve sözkonusu faktörler analiz edilmiştir. Araştırma kapsamında elde edilen verilerin analizi için betimsel analiz yönteminden yararlanılmış olup, Microsoft Excel 2010 ve IBM SPSS Statistics 21.0 programları kullanılmıştır. Ayrıca, çalışmada analiz sonuçlarına ve geliştirilen yazılımların başarı düzeylerine ayrıntılı bir şekilde yer verilmiştir. Elde edilen sonuçlar içerisinde özellikle; proje süresi, bütçesi, personel sayısı ve hedeflerdeki sapmalara rağmen Teknokent’lerde geliştirilen yazılım projelerinin yaklaşık %95’inin başarıyla sonuçlandırılmış ve müşteriye teslim edilmiş olması dikkat çekmektedir.

References

  • Gürbüz, A. (2010) Yazılım Test Mühendisliği, Papatya Yayıncılık Eğitim, İstanbul, 31,34.
  • Yong. H., Xiangzhou. Z., Xin. S., Mei. L., Jianfeng . D. (2009) An Intelligent Model for Software Project Risk Prediction, International Conference on Information Management, Innovation Management and Industrial Engineering, ICIII, vol. 1, pp.629-632.
  • Tang. A., Wang. R. (2010) Software Project Risk Assessment Model Based on FuzzyTheory, Computer and Communication Technologies in Agriculture Engineering (CCTAE), 2010 International Conference On 12-13 June 2010, pp 328-330.
  • Robert. N. C. (1996) Large-Scale Project Management is Risk Management, IEEE Software.
  • Gülebağlan, S. (2006) Yazılım Geliştirmede Risk Yönetimi, Yüksek Lisans Tezi, Çanakkale Onsekiz Mart Üniversitesi, Fen Bilimleri Enstitüsü.
  • C.Ravindranath Pandian, "Applied Software Risk Management a Guide for Software Project Managers", Auerbach Publications, United States of America, 2007, Chapters 2,3,5.
  • Yudistira Asnar, Paolo Giorgini, "Risk Analysis as part of the Requirements Engineering Process" University of Trento, Department of Information and Communication Technology, 2007.
  • Bryan L. McKinney, David R. Engfer, "Formulating Risk into Research and Engineering Projects", Crystal Ball User Conference, 2004.
  • Proc. SEI Conf. Risk Management, Managing Uncertainty in a Changing World, Apr. 1997.
  • A.McKinlay VI, “Software System Safety Engineering,” Software Safety Eng. Course, June 1992.
  • U.S. Air Force, “Software Risk Abatement,”AFSC/AFLC Pamphlet 800-45, Sept. 1988.
  • L.L. Russo, “Software System Safety Guide,” U.S. Army Communications ElectronicsCommandreportCECOM-TR-92-2,May1992.
  • Neumann, D. E., An Enhanced Neural Network Technique for Software Risk Analysis. Donald E.Neumann. IEEE Trans. Software Eng. 28(9):904-912 (2002)
  • Standards Australia and New Zealand, Australian/New Zealand Standard (2004) Risk Management AS/NZS 4360:2004. 3rd Ed., Stds Australia/New Zealand.
  • Project Management Institute (2004) A Guide to the Project Management Body of Knowledge (PMBoK), 3rd Ed. ANSI/PMI 99-001-2004, PMI, Newton Square, PA.
  • Boehm, B.W. (1991) Software Risk Management: Principle and Practices, IEEE Software, Vol. 8, No. 1, January 1991.
  • Kajko-Mattsson, M., Nyfjord, J. (2008) State of software risk management practice, LAENG International Journal of Computer Science, November.
  • Li X., Liu S., Cai W., Feng S., "The Application of Risk Matrix to Software Project Risk Management," International Forum on Information Technology and Applications, IFITA, vol. 2, pp.480-483, 2009.
There are 18 citations in total.

Details

Primary Language Turkish
Subjects Engineering
Journal Section Articles
Authors

M.Hanefi Calp

M. Ali Akcayol

Publication Date January 30, 2015
Published in Issue Year 2015 Volume: 3 Issue: 1

Cite

APA Calp, M., & Akcayol, M. A. (2015). Teknokent’lerde Geliştirilen Yazılım Projelerinin Risk Analizi ve Başarı Düzeyleri. Duzce University Journal of Science and Technology, 3(1), 57-75.
AMA Calp M, Akcayol MA. Teknokent’lerde Geliştirilen Yazılım Projelerinin Risk Analizi ve Başarı Düzeyleri. DUBİTED. January 2015;3(1):57-75.
Chicago Calp, M.Hanefi, and M. Ali Akcayol. “Teknokent’lerde Geliştirilen Yazılım Projelerinin Risk Analizi Ve Başarı Düzeyleri”. Duzce University Journal of Science and Technology 3, no. 1 (January 2015): 57-75.
EndNote Calp M, Akcayol MA (January 1, 2015) Teknokent’lerde Geliştirilen Yazılım Projelerinin Risk Analizi ve Başarı Düzeyleri. Duzce University Journal of Science and Technology 3 1 57–75.
IEEE M. Calp and M. A. Akcayol, “Teknokent’lerde Geliştirilen Yazılım Projelerinin Risk Analizi ve Başarı Düzeyleri”, DUBİTED, vol. 3, no. 1, pp. 57–75, 2015.
ISNAD Calp, M.Hanefi - Akcayol, M. Ali. “Teknokent’lerde Geliştirilen Yazılım Projelerinin Risk Analizi Ve Başarı Düzeyleri”. Duzce University Journal of Science and Technology 3/1 (January 2015), 57-75.
JAMA Calp M, Akcayol MA. Teknokent’lerde Geliştirilen Yazılım Projelerinin Risk Analizi ve Başarı Düzeyleri. DUBİTED. 2015;3:57–75.
MLA Calp, M.Hanefi and M. Ali Akcayol. “Teknokent’lerde Geliştirilen Yazılım Projelerinin Risk Analizi Ve Başarı Düzeyleri”. Duzce University Journal of Science and Technology, vol. 3, no. 1, 2015, pp. 57-75.
Vancouver Calp M, Akcayol MA. Teknokent’lerde Geliştirilen Yazılım Projelerinin Risk Analizi ve Başarı Düzeyleri. DUBİTED. 2015;3(1):57-75.