Research Article
BibTex RIS Cite

EVALUATION OF PRODUCTION PROCESS of A FACTORY BY USE of SIMULATION APPROACH

Year 2017, Özel Sayı - ICEBSS 2017, 149 - 160, 10.11.2017

Abstract

It is very important to reduce costs and increase productivity because of increased competition in business life. In order to increase productivity, the process needs to be analyzed correctly. In this study, a company that produces solar energy systems is considered. Firstly, the process was analyzed using a work study. Process improvement studies were carried out on the basis of obtained results. There are two types of products namely “SEWHS (Solar Energy Water Heater Systems)” and “Boiler”. The system works as pull-out. The main problem is that when the order comes, they don’t know when to meet this demand. In order to overcome this problem, a simulation model has been developed. With the content of study, the work flow diagram and machine-equipment layouts have been developed. After that time studies have been carried out to obtain standard times for each process. Those are used in the ARENA 10.0 software and system is simulated. As a result of the simulation, the amount of products in the queue, waiting time and bottlenecks are determined. In addition, the company's ability to meet demands and the resource utilization rates of the machines have been determined. By using simulation software, company started to determine product delivery time.

References

  • B. Deros, N. Rahman, M. N. Rahman, A. R. Ismail and A. H. Said, “Application of Quality Function Deployment to Study Critical Service Quality Characteristics and Performance Measures,” European Journal of Scientific Research, vol. 33, no. 3, pp. 398–410, 2009
  • C. Türker, “Bankacılıkta Süreç İyileştirmeye Yönelik Temel Kalite Kontrol Teknikleri: Bir Uygulama,” Hacettepe Üniversitesi, Sosyal Bilimler Enstitüsü, Yüksek Lisans Tezi, Ankara, 2001
  • F. Çırkan, “Altı Sigma Süreç İyileştirme ve Sanayide Bir Uygulama,” Uludağ Üniversitesi, Fen Bilimleri Enstitüsü, Yüksek Lisans Tezi, Bursa, 2009
  • F. J. Pino, F. Garcia and M. Piattini, “Software Perocess İmprovement in Small and Medium Software Enterprises a Systematic Review,” Software Quality Journal, 16: 237261, 2008
  • F. Yağız, “Otomotiv Yan Sanayinde ISO/TS 16949 Kapsamında Süreç İyileştirme Uygulaması,” Kocaeli Üniversitesi, Fen Bilimleri Enstitüsü, Yüksek Lisans Tezi, Kocaeli, 2010
Year 2017, Özel Sayı - ICEBSS 2017, 149 - 160, 10.11.2017

Abstract

References

  • B. Deros, N. Rahman, M. N. Rahman, A. R. Ismail and A. H. Said, “Application of Quality Function Deployment to Study Critical Service Quality Characteristics and Performance Measures,” European Journal of Scientific Research, vol. 33, no. 3, pp. 398–410, 2009
  • C. Türker, “Bankacılıkta Süreç İyileştirmeye Yönelik Temel Kalite Kontrol Teknikleri: Bir Uygulama,” Hacettepe Üniversitesi, Sosyal Bilimler Enstitüsü, Yüksek Lisans Tezi, Ankara, 2001
  • F. Çırkan, “Altı Sigma Süreç İyileştirme ve Sanayide Bir Uygulama,” Uludağ Üniversitesi, Fen Bilimleri Enstitüsü, Yüksek Lisans Tezi, Bursa, 2009
  • F. J. Pino, F. Garcia and M. Piattini, “Software Perocess İmprovement in Small and Medium Software Enterprises a Systematic Review,” Software Quality Journal, 16: 237261, 2008
  • F. Yağız, “Otomotiv Yan Sanayinde ISO/TS 16949 Kapsamında Süreç İyileştirme Uygulaması,” Kocaeli Üniversitesi, Fen Bilimleri Enstitüsü, Yüksek Lisans Tezi, Kocaeli, 2010
There are 5 citations in total.

Details

Journal Section Issue
Authors

Hakan Öztürk

Birol Elevli

Neslihan Malkoç This is me

Publication Date November 10, 2017
Submission Date November 10, 2017
Published in Issue Year 2017 Özel Sayı - ICEBSS 2017

Cite

APA Öztürk, H., Elevli, B., & Malkoç, N. (2017). EVALUATION OF PRODUCTION PROCESS of A FACTORY BY USE of SIMULATION APPROACH. Kastamonu Üniversitesi İktisadi Ve İdari Bilimler Fakültesi Dergisi149-160.