Research Article
BibTex RIS Cite
Year 2018, , 230 - 234, 20.04.2018
https://doi.org/10.29187/jscmt.2018.24

Abstract

References

  • 1. Ilıcalı, Mustafa, ‘Yüksek Hızlı Demiryolu Yatırımlarının Ülke ve Bölgeye Etkisi’, Taşıma Dünyası, 2015: 4.
  • 2. Kızıltaş, Mehmet Çağrı, ‘Avrupa Birliği ve Ulaştırma Politikaları’, Ulaştırma Dünyası, 2015: 3.
  • 3. Kızıltaş, Mehmet Çağrı, ‘Yüksek Hızlı Demiryolu Analizleri’, Ulaştırma Dünyası, 2016: 5.
  • 4. Banwell, H., The placing and management of contracts for building and civil engineering works. HMSO, London, 1964: 3.
  • 5. Bernstein, P.G. and Pittman, J.H., Barriers to the Adoption of Building Information, 2005: 4.
  • 6. Bew, M. And Underwood, J., Delivering BIM to the UK Market, in: Handbook of research on building information modelling and construction informatics: concepts and technologies. IGI-Global, New York, 2009, 30-64.
  • 7. Blismas, N.G.,Pendlebury, M.C, Gibb, A.G.F. and Pasquire, C.L., Constraints to the Use of Off-site Production on Construction Projects, Architectural Engineering and Design Management, 1(3), 2005: 153- 162.

Infrastructure Projects In Turkey and Innovative Implementations In Project Management

Year 2018, , 230 - 234, 20.04.2018
https://doi.org/10.29187/jscmt.2018.24

Abstract

In Turkey, transportation investments have taken the first number on the agenda on the last decades. Tremendeus
projects like Kanalistanbul is mnetioned beside many airport projects in Anatolian cities that are existing many urban
railway system projects in Istanbul and any other major cities beside high speed railway projects that connects the
cities of Turkey by west to east and by south to north. Turkey continues the period of infrastructural establishment
and renowation rapidly as a developing country which aims to being one of the biggest economy all over the world.
Because of these, project management, management notions, usage of innovative Technologies and organizational
structures have a vital role in Turkey which has a dense infrastructure establishment period and gives prority to
transportation.

References

  • 1. Ilıcalı, Mustafa, ‘Yüksek Hızlı Demiryolu Yatırımlarının Ülke ve Bölgeye Etkisi’, Taşıma Dünyası, 2015: 4.
  • 2. Kızıltaş, Mehmet Çağrı, ‘Avrupa Birliği ve Ulaştırma Politikaları’, Ulaştırma Dünyası, 2015: 3.
  • 3. Kızıltaş, Mehmet Çağrı, ‘Yüksek Hızlı Demiryolu Analizleri’, Ulaştırma Dünyası, 2016: 5.
  • 4. Banwell, H., The placing and management of contracts for building and civil engineering works. HMSO, London, 1964: 3.
  • 5. Bernstein, P.G. and Pittman, J.H., Barriers to the Adoption of Building Information, 2005: 4.
  • 6. Bew, M. And Underwood, J., Delivering BIM to the UK Market, in: Handbook of research on building information modelling and construction informatics: concepts and technologies. IGI-Global, New York, 2009, 30-64.
  • 7. Blismas, N.G.,Pendlebury, M.C, Gibb, A.G.F. and Pasquire, C.L., Constraints to the Use of Off-site Production on Construction Projects, Architectural Engineering and Design Management, 1(3), 2005: 153- 162.
There are 7 citations in total.

Details

Primary Language English
Subjects Civil Engineering
Journal Section Research Articles
Authors

İskender Eyüp Ekiz This is me

Mehmet Fatih Altan This is me

Publication Date April 20, 2018
Submission Date February 7, 2018
Acceptance Date April 13, 2018
Published in Issue Year 2018

Cite

APA Ekiz, İ. E., & Altan, M. F. (2018). Infrastructure Projects In Turkey and Innovative Implementations In Project Management. Journal of Sustainable Construction Materials and Technologies, 3(2), 230-234. https://doi.org/10.29187/jscmt.2018.24