Research Article
BibTex RIS Cite

AN APPLICATION ON ALLOCATION AND BALANCING OF LABOR RESOURCES WITH WIEST METHOD IN RESOURCE LIMITED MULTIPLE CONSTRUCTION PROJECTS

Year 2023, Volume: 31 Issue: 1, 580 - 589, 29.04.2023
https://doi.org/10.31796/ogummf.1237568

Abstract

Nowadays, there is a need to manage construction projects in the best way in terms of time-cost. Managing construction projects, especially with limited resources, is a frequently encountered problem in practice. In addition, when the number of projects increases and common resources are used, the allocation of resources to projects is of great importance in terms of time-cost in applications where many construction schedules overlap.
In this study, it has been investigated that how these limited resources can be used in projects in case of using common resources in multiple construction projects with limited resources. For this purpose, a sample application on the balancing and allocation of labour resources by using the “WIEST Resource Balancing Method” is conducted and the issues that need to be done in project management and construction schedules are discussed. Three construction projects to be built on distant sites with specific project start dates and manufacturing quantity values are considered. In case of using common labour resources in these projects, it is aimed to integrate these labour resources into the projects in the most appropriate way in terms of time-cost.
According to the findings of this study, it shows that many adjustments in terms of time and cost are necessary in case of using labour resource balancing with the WIEST method in projects that will start at the same time and have limited labour resources. It has also been observed that although there is a certain increase in project durations, it provides a reduction in project costs.

References

  • Wiest, J. D., (1967), “A Heuristic Model for Scheduling Large Project with Limited Resources”, Management Science, Vol.13, Issue 6, pp.359-377.
  • Hiyassat, M. A. S., (2000), “Modification of Minimum Moment Approach in Resources Leveling”, Journal of Construction Engineering and Management, Vol.126, Issue 4, pp.278-284-377.
  • Christodoulou, S. E., Ellinas, G., and Michaelidou-Kamenou, A. (2010). “Minimum Moment Method for Resource Leveling Using Entropy Maximization”, Journal of Construction Engineering and Management, 136(5), pp. 518-527.
  • Rieck J., Zimmermann J., Gather T., (2012) “Mixed-integer linear programming for resource leveling problems”, European Journal of Operational Research, 221 (1) , pp. 27-37.
  • Iranagh M.A., and R. Sonmez, (2012), “A Genetic Algorithm for Resource Levelling of Construction Projects”, Proceedings of the 28th Annual ARCOM Conference (2012), pp. 1047-1054
  • Yıldırım, E. Ergün, Ö. H. Bettemir, (2016), “Bina Bilgi Modeli Destekli Kaynak Dengeleme Uygulaması Örneği” 4. Proje ve Yapım Yönetimi Kongresi, 3 – 5 Kasım 2016 Anadolu Üniversitesi, Mühendislik Fakültesi, İnşaat Mühendisliği Bölümü, Eskişehir.
  • Soysal S., Dengiz B. ve Atalay, K. D., (2021), “Belirsizlik Altında Kaynak Kısıtlı Çok Modlu Çoklu Proje Çizelgeleme”, Journal of the Turkish Operations Management (JTOM), Vl. 5, Issue 2., pp. 598,614.
  • Qiao, Jianfeng & Li, Yu. (2018). “Resource Leveling Using Normalized Entropy and Relative Entropy”. Automation in Construction. Vol 87. Issue March 2018, pp. 263-272.
  • Erdoğan O., (2021), “Kaynak Kısıtlı İnşaat İşlerinde İşgücü Planlaması ve Kaynak Dengelenmesi”, Eskişehir Osmangazi Üniversitesi Fen Bilimleri Enstitüsü, Yayınlanmamış Yüksek Lisans Tezi,, 67 syf.
  • Ponz-Tienda, J., Salcedo-Bernal, A., Pellicer, E., Benlloch-Marco, J., (2017), “Improved Adaptive Harmony Search Algorithm for The Resource Leveling Problem with Minimal Lags”, Automation in Construction, Vol. 77, pp. 82-92.
  • Azaron, A., Katagiri, H., Sakawa, M., Kato, K., & Memariani, A., (2006), “A Multi-Objective Resource Allocation Problem in PERT Networks”, European Journal of Operational Research, Vol. 172, s. 815-830.
  • Kuruoğlu, M., Bayoğlu, F.İ., (2001) “Yapı Üretiminde Adam-Saat Değerlerinin Belirlenmesi Üzerine Bir Araştırma ve Sonuçları”, 16. İnşaat Mühendisliği Teknik Kongresi, Ankara, No:65
  • Avdan O. M., (2022), “Çoklu İnşaat Projeleri İçin Kaynak Tahsis Modelleri”, Eskişehir Osmangazi Üniversitesi Fen Bilimleri Enstitüsü, Yayınlanmamış Yüksek Lisans Tezi,, 58 syf.

KAYNAK KISITLI ÇOKLU İNŞAAT PROJELERİNDE WIEST YÖNTEMİYLE İŞGÜCÜ KAYNAKLARININ TAHSİSİ VE DENGELEMESİ ÜZERİNE BİR UYGULAMA

Year 2023, Volume: 31 Issue: 1, 580 - 589, 29.04.2023
https://doi.org/10.31796/ogummf.1237568

Abstract

Günümüzde inşaat projelerinin süre-maliyet açısından en iyi şekilde yönetilmesine ihtiyaç duyulmaktadır. Özellikle kısıtlı kaynaklar ile inşaat projelerinin yönetilmesi, uygulamada sıkça karşılaşılan bir problem olarak karşımıza çıkmaktadır. Buna ilave olarak, proje sayısı arttığında ve ortak kaynakların kullanılması durumunda, birçok iş programının birbirine geçtiği uygulamalarda, kaynakların projelere tahsisi, süre-maliyet açısından çok büyük önem arz etmektedir.
Bu çalışmada kaynakları kısıtlı çoklu inşaat projelerinde; ortak işgücü kaynaklarının kullanması durumunda, bu kısıtlı işgücü kaynaklarının projelerde nasıl kullanılabileceği araştırılmıştır. Bu amaçla, WIEST kaynak dengeleme yöntemi kullanılarak işgücü kaynaklarının dengelenmesi ve tahsisi üzerine örnek bir uygulama yapılarak proje yönetimi ve iş programlarında yapılması gereken hususlar ele alınmıştır. Proje başlangıç tarihleri ve imalat metraj değerleri bilinen birbirinden uzak parsellerde inşa edilecek üç inşaat projesi ele alınmıştır. Bu projelerde ortak işgücü kaynaklarını kullanması durumunda, bu işgücü kaynaklarının süre-maliyet açısından en uygun biçimde projelere entegre edilmesi amaçlanmıştır.
Yapılan bu çalışmadan elde edilen bulgulara göre, aynı zamanda başlayacak ve işgücü kaynakları kısıtlı projelerde WIEST yöntemiyle işgücü kaynak dengelemenin kullanılması durumunda süre ve maliyet açısından birçok düzenlemenin yapılmasının gerekli olduğunu görülmüştür. Ayrıca proje sürelerinde belli bir artış olmasına rağmen proje maliyetlerinde azalma sağladığı görülmüştür.

References

  • Wiest, J. D., (1967), “A Heuristic Model for Scheduling Large Project with Limited Resources”, Management Science, Vol.13, Issue 6, pp.359-377.
  • Hiyassat, M. A. S., (2000), “Modification of Minimum Moment Approach in Resources Leveling”, Journal of Construction Engineering and Management, Vol.126, Issue 4, pp.278-284-377.
  • Christodoulou, S. E., Ellinas, G., and Michaelidou-Kamenou, A. (2010). “Minimum Moment Method for Resource Leveling Using Entropy Maximization”, Journal of Construction Engineering and Management, 136(5), pp. 518-527.
  • Rieck J., Zimmermann J., Gather T., (2012) “Mixed-integer linear programming for resource leveling problems”, European Journal of Operational Research, 221 (1) , pp. 27-37.
  • Iranagh M.A., and R. Sonmez, (2012), “A Genetic Algorithm for Resource Levelling of Construction Projects”, Proceedings of the 28th Annual ARCOM Conference (2012), pp. 1047-1054
  • Yıldırım, E. Ergün, Ö. H. Bettemir, (2016), “Bina Bilgi Modeli Destekli Kaynak Dengeleme Uygulaması Örneği” 4. Proje ve Yapım Yönetimi Kongresi, 3 – 5 Kasım 2016 Anadolu Üniversitesi, Mühendislik Fakültesi, İnşaat Mühendisliği Bölümü, Eskişehir.
  • Soysal S., Dengiz B. ve Atalay, K. D., (2021), “Belirsizlik Altında Kaynak Kısıtlı Çok Modlu Çoklu Proje Çizelgeleme”, Journal of the Turkish Operations Management (JTOM), Vl. 5, Issue 2., pp. 598,614.
  • Qiao, Jianfeng & Li, Yu. (2018). “Resource Leveling Using Normalized Entropy and Relative Entropy”. Automation in Construction. Vol 87. Issue March 2018, pp. 263-272.
  • Erdoğan O., (2021), “Kaynak Kısıtlı İnşaat İşlerinde İşgücü Planlaması ve Kaynak Dengelenmesi”, Eskişehir Osmangazi Üniversitesi Fen Bilimleri Enstitüsü, Yayınlanmamış Yüksek Lisans Tezi,, 67 syf.
  • Ponz-Tienda, J., Salcedo-Bernal, A., Pellicer, E., Benlloch-Marco, J., (2017), “Improved Adaptive Harmony Search Algorithm for The Resource Leveling Problem with Minimal Lags”, Automation in Construction, Vol. 77, pp. 82-92.
  • Azaron, A., Katagiri, H., Sakawa, M., Kato, K., & Memariani, A., (2006), “A Multi-Objective Resource Allocation Problem in PERT Networks”, European Journal of Operational Research, Vol. 172, s. 815-830.
  • Kuruoğlu, M., Bayoğlu, F.İ., (2001) “Yapı Üretiminde Adam-Saat Değerlerinin Belirlenmesi Üzerine Bir Araştırma ve Sonuçları”, 16. İnşaat Mühendisliği Teknik Kongresi, Ankara, No:65
  • Avdan O. M., (2022), “Çoklu İnşaat Projeleri İçin Kaynak Tahsis Modelleri”, Eskişehir Osmangazi Üniversitesi Fen Bilimleri Enstitüsü, Yayınlanmamış Yüksek Lisans Tezi,, 58 syf.
There are 13 citations in total.

Details

Primary Language Turkish
Subjects Civil Engineering
Journal Section Research Articles
Authors

Osman Mert Avdan 0000-0001-5564-1102

Osman Aytekin 0000-0002-5916-0725

Hakan Kuşan 0000-0001-7689-2808

Early Pub Date April 27, 2023
Publication Date April 29, 2023
Acceptance Date March 9, 2023
Published in Issue Year 2023 Volume: 31 Issue: 1

Cite

APA Avdan, O. M., Aytekin, O., & Kuşan, H. (2023). KAYNAK KISITLI ÇOKLU İNŞAAT PROJELERİNDE WIEST YÖNTEMİYLE İŞGÜCÜ KAYNAKLARININ TAHSİSİ VE DENGELEMESİ ÜZERİNE BİR UYGULAMA. Eskişehir Osmangazi Üniversitesi Mühendislik Ve Mimarlık Fakültesi Dergisi, 31(1), 580-589. https://doi.org/10.31796/ogummf.1237568
AMA Avdan OM, Aytekin O, Kuşan H. KAYNAK KISITLI ÇOKLU İNŞAAT PROJELERİNDE WIEST YÖNTEMİYLE İŞGÜCÜ KAYNAKLARININ TAHSİSİ VE DENGELEMESİ ÜZERİNE BİR UYGULAMA. ESOGÜ Müh Mim Fak Derg. April 2023;31(1):580-589. doi:10.31796/ogummf.1237568
Chicago Avdan, Osman Mert, Osman Aytekin, and Hakan Kuşan. “KAYNAK KISITLI ÇOKLU İNŞAAT PROJELERİNDE WIEST YÖNTEMİYLE İŞGÜCÜ KAYNAKLARININ TAHSİSİ VE DENGELEMESİ ÜZERİNE BİR UYGULAMA”. Eskişehir Osmangazi Üniversitesi Mühendislik Ve Mimarlık Fakültesi Dergisi 31, no. 1 (April 2023): 580-89. https://doi.org/10.31796/ogummf.1237568.
EndNote Avdan OM, Aytekin O, Kuşan H (April 1, 2023) KAYNAK KISITLI ÇOKLU İNŞAAT PROJELERİNDE WIEST YÖNTEMİYLE İŞGÜCÜ KAYNAKLARININ TAHSİSİ VE DENGELEMESİ ÜZERİNE BİR UYGULAMA. Eskişehir Osmangazi Üniversitesi Mühendislik ve Mimarlık Fakültesi Dergisi 31 1 580–589.
IEEE O. M. Avdan, O. Aytekin, and H. Kuşan, “KAYNAK KISITLI ÇOKLU İNŞAAT PROJELERİNDE WIEST YÖNTEMİYLE İŞGÜCÜ KAYNAKLARININ TAHSİSİ VE DENGELEMESİ ÜZERİNE BİR UYGULAMA”, ESOGÜ Müh Mim Fak Derg, vol. 31, no. 1, pp. 580–589, 2023, doi: 10.31796/ogummf.1237568.
ISNAD Avdan, Osman Mert et al. “KAYNAK KISITLI ÇOKLU İNŞAAT PROJELERİNDE WIEST YÖNTEMİYLE İŞGÜCÜ KAYNAKLARININ TAHSİSİ VE DENGELEMESİ ÜZERİNE BİR UYGULAMA”. Eskişehir Osmangazi Üniversitesi Mühendislik ve Mimarlık Fakültesi Dergisi 31/1 (April 2023), 580-589. https://doi.org/10.31796/ogummf.1237568.
JAMA Avdan OM, Aytekin O, Kuşan H. KAYNAK KISITLI ÇOKLU İNŞAAT PROJELERİNDE WIEST YÖNTEMİYLE İŞGÜCÜ KAYNAKLARININ TAHSİSİ VE DENGELEMESİ ÜZERİNE BİR UYGULAMA. ESOGÜ Müh Mim Fak Derg. 2023;31:580–589.
MLA Avdan, Osman Mert et al. “KAYNAK KISITLI ÇOKLU İNŞAAT PROJELERİNDE WIEST YÖNTEMİYLE İŞGÜCÜ KAYNAKLARININ TAHSİSİ VE DENGELEMESİ ÜZERİNE BİR UYGULAMA”. Eskişehir Osmangazi Üniversitesi Mühendislik Ve Mimarlık Fakültesi Dergisi, vol. 31, no. 1, 2023, pp. 580-9, doi:10.31796/ogummf.1237568.
Vancouver Avdan OM, Aytekin O, Kuşan H. KAYNAK KISITLI ÇOKLU İNŞAAT PROJELERİNDE WIEST YÖNTEMİYLE İŞGÜCÜ KAYNAKLARININ TAHSİSİ VE DENGELEMESİ ÜZERİNE BİR UYGULAMA. ESOGÜ Müh Mim Fak Derg. 2023;31(1):580-9.

20873  13565  13566 15461  13568    14913