paper presents a comparison of the three thermoeconomic methodologies, SPECO
(Specific exergy costing), MOPSA (Modified productive structure analysis) and
Moran for an existing binary geothermal power plant in western Turkey. Exergy and exergoeconomic analyses of the
Dora II binary geothermal power plant with 9543 kW net power output is carried out by using actual plant data to
evaluate plant performances and thermoeconomic costs. The objective of
the study is to perform the advantages and disadvantages of the presented
thermoeconomic methods with respect to the one other using a binary geothermal
plant data. The presented thermoeconomic methodologies are used to reveal and
compare the cost flows and products interactions between the system components.
The overall energy and exergy efficiencies of the plant are calculated to be
47.3% and 13.5%. The unit exergetic costs of electricity are calculated to be
0.0436 $/kWh for MOPSA method, 0.0367 $/kWh for SPECO method and 0.0355 $/kWh
for MORAN method, respectively.
Primary Language | English |
---|---|
Journal Section | Articles |
Authors | |
Publication Date | June 25, 2018 |
Submission Date | November 9, 2017 |
Published in Issue | Year 2018 Volume: 4 Issue: 5 |
IMPORTANT NOTE: JOURNAL SUBMISSION LINK http://eds.yildiz.edu.tr/journal-of-thermal-engineering