A Tabu Search Algorithm for an Excavator Scheduling Problem

Yıl 2020, Cilt: 4 Sayı: 1, 1 - 11, 30.06.2020

Öz

Global sector prompts the construction firms to give a priority to time and cost factors. Thus, scheduling of the jobs is focal important to achieve cost and time objectives. Scheduling problems have gained a great importance in recent years in the construction sector. We have examined a single machine scheduling problem for an excavator used in the construction sector. There are some jobs in which each job has a normal processing time, a due date, earliness penalty and tardiness penalty. This paper presents a meta-heuristic optimization algorithm named Tabu Search (TS) to minimize the total cost and provides how it can be used to solve a wide variety of single machine scheduling problems. Computational results demonstrates that the proposed approach is a good tool for these problems.

Kaynakça

  • [1] M. Ben-daya and M. Al-Fawzan, “An efficient Tabu search algorithm for the single machine mean tardiness problem”. Production Planning and Control, vol. 8, no, 7, 1997.
  • [2] K. Xu, Z. Feng, and K. Jun, “A tabu-search algorithm for scheduling jobs with controllable processing times on a single machine to meet due-dates”, Computers & Operations Research, vol. 37, no. 11, pp. 1924–1938, 2010.
  • [3] V. Ateş, and N. Barışçı, “Short-term load forecasting model using flower pollination algorithm”, International Scientific and Vocational Studies Journal, vol. 1, no. 1, pp. 22-29.2017.
  • [4] İ. B. Koç, A. Al Janadi, and V. Ateş, “Interlock optimization of an accelerator using genetic algorithm”, International Scientific and Vocational Studies Journal, vol. 1, no. 1, pp. 30-41, 2017.
  • [5] C. Oguz, F. Salman, and Z. Yalçın, “Order acceptance and scheduling decisions in make-to-order systems”, International Journal of Production Economics, vol. 125, pp. 200–211, 2010.
  • [6] M. Laguna, J. W. Barnes, and F. Glover, “Tabu search methods for a single machine scheduling problem”, Journal of Intelligent Manufacturing, vol. 2, pp. 63–74, 1991.
  • [7] J. S. Chen, “Using integer programming to solve the machine scheduling problem with a flexible maintenance activity”, Journal of Statistics and Management Systems, vol. 9, no. 1, pp. 87–104, 2006.
  • [8] J. S. Chen, “Optimization models for the machine scheduling problem with a single flexible maintenance activity”, Engineering Optimization, vol. 38, no. 1, 53–71, 2006.
  • [9] O. Hinder, and A. J. Mason, “A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness”, European Journal of Operational Research, vol. 262, no. 2, pp. 411-423, 2017.
  • [10] A. Ghodratnama, M. Rabbani, R. Tavakkoli-Moghaddam, and A. Baboli, “Solving a single-machine scheduling problem with maintenance, job deterioration and learning effect by simulated annealing”, Journal of Manufacturing Systems, vol 29, no. 1, pp. 1-9, 2010.
  • [11]V. Kayvanfar, I. Mahdavi, G.M. Komaki, “Single machine scheduling with controllable processing times to minimize total tardiness and earliness”, Computers & Industrial Engineering, vol. 65, no. 1, pp. 166-175, 2013.
  • [12] I. Adiri, J. Bruno, E. Frostig, A. H. G. Rinnooy Kan, “Single machine flow time scheduling with a single breakdown”, Acta Informatica, vol. 26, no. 7, pp. 679–696, 1989.
  • [13] F. Jin, J. N. Gupta, S. Song, C. Wu, “Single machine scheduling with sequence-dependent family setups to minimize maximum lateness”, Journal of the Operational Research Society, vol. 61, no. 7, pp. 1181-1189, 2010.
  • [14] A. Yurtkuran and E. Emel, “A discrete artificial bee colony algorithm for single machine scheduling problems”, International Journal of Production Research, vol. 54, no. 22, pp. 6860-6878, 2016.
  • [15] Y. Suppiah, and M. K. Omar, “A hybrid tabu search for batching and sequencing decisions in a single machine environment”, Computers & Industrial Engineering, vol. 78, pp. 135-147, 2014.
  • [16] M. T. Almeida, and M. Centeno, “A composite heuristic for the single machine early/tardy job scheduling problem”, Computers & Operations Research, vol. 25, no. 7-8, pp. 625–635, 1998.
  • [17] J. M. S Valente, and R. A. F. S. Alves, “Heuristics for The Single Machine Scheduling Problem with Quadratic Earliness and Tardiness Penalties”, Computers & Operational Research, vol. 35, pp. 3696–3713, 2008.
  • [18] F. Della Croce, and V. T'kindt, “A recovering beam search algorithm for the one-machine dynamic total completion time scheduling problem”, Journal of the Operational Research Society, vol. 53, no. 11, pp. 1275-1280, 2002.
  • [19] A. Jouglet, D. Savourey, J. Carlier, and P. Baptiste, “Dominance-based heuristics for one-machine total cost scheduling problems”, European Journal of Operational Research, vol. 184, no. 3, pp. 879-899, 2008.
  • [20] M. Vila, and J. Pereira, “Exact and heuristic procedures for single machine scheduling with quadratic earliness and tardiness penalties”, Computers & Operations Research, vol. 40, no. 7, pp. 1819-1828, 2013.
  • [21] F. Della Croce, F. Salassa, and V. T'kindt, “ A hybrid heuristic approach for single machine scheduling with release times”, Computers & Operations Research, vol. 45, pp. 7-11, 2014.
  • [22] R. M’Hallah, and A. Alhajraf, “Ant colony systems for the single-machine total weighted earliness tardiness scheduling problem”, Journal of Scheduling, vol. 19, no. 2, pp. 191-205, 2016.
  • [23] B. Yang, J. Geunes, and W. J. O'Brien, “A heuristic approach for minimizing weighted tardiness and overtime costs in single resource scheduling”, Computers & Operations Research, vol. 31, no. 8, pp. 1273-1301, 2004.

A Tabu Search Algorithm for an Excavator Scheduling Problem

Yıl 2020, Cilt: 4 Sayı: 1, 1 - 11, 30.06.2020

Öz



Global sector prompts the construction firms to give a priority to time and cost factors. Thus, scheduling of the jobs is focal important to achieve cost and time objectives. Scheduling problems have gained a great importance in recent years in the construction sector. We have examined a single machine scheduling problem for an excavator used in the construction sector. There are some jobs in which each job has a normal processing time, a due date, earliness penalty and tardiness penalty. This paper presents a meta-heuristic optimization algorithm named Tabu Search (TS) to minimize the total cost and provides how it can be used to solve a wide variety of single machine scheduling problems. Computational results demonstrates that the proposed approach is a good tool for these problems.



Kaynakça

  • [1] M. Ben-daya and M. Al-Fawzan, “An efficient Tabu search algorithm for the single machine mean tardiness problem”. Production Planning and Control, vol. 8, no, 7, 1997.
  • [2] K. Xu, Z. Feng, and K. Jun, “A tabu-search algorithm for scheduling jobs with controllable processing times on a single machine to meet due-dates”, Computers & Operations Research, vol. 37, no. 11, pp. 1924–1938, 2010.
  • [3] V. Ateş, and N. Barışçı, “Short-term load forecasting model using flower pollination algorithm”, International Scientific and Vocational Studies Journal, vol. 1, no. 1, pp. 22-29.2017.
  • [4] İ. B. Koç, A. Al Janadi, and V. Ateş, “Interlock optimization of an accelerator using genetic algorithm”, International Scientific and Vocational Studies Journal, vol. 1, no. 1, pp. 30-41, 2017.
  • [5] C. Oguz, F. Salman, and Z. Yalçın, “Order acceptance and scheduling decisions in make-to-order systems”, International Journal of Production Economics, vol. 125, pp. 200–211, 2010.
  • [6] M. Laguna, J. W. Barnes, and F. Glover, “Tabu search methods for a single machine scheduling problem”, Journal of Intelligent Manufacturing, vol. 2, pp. 63–74, 1991.
  • [7] J. S. Chen, “Using integer programming to solve the machine scheduling problem with a flexible maintenance activity”, Journal of Statistics and Management Systems, vol. 9, no. 1, pp. 87–104, 2006.
  • [8] J. S. Chen, “Optimization models for the machine scheduling problem with a single flexible maintenance activity”, Engineering Optimization, vol. 38, no. 1, 53–71, 2006.
  • [9] O. Hinder, and A. J. Mason, “A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness”, European Journal of Operational Research, vol. 262, no. 2, pp. 411-423, 2017.
  • [10] A. Ghodratnama, M. Rabbani, R. Tavakkoli-Moghaddam, and A. Baboli, “Solving a single-machine scheduling problem with maintenance, job deterioration and learning effect by simulated annealing”, Journal of Manufacturing Systems, vol 29, no. 1, pp. 1-9, 2010.
  • [11]V. Kayvanfar, I. Mahdavi, G.M. Komaki, “Single machine scheduling with controllable processing times to minimize total tardiness and earliness”, Computers & Industrial Engineering, vol. 65, no. 1, pp. 166-175, 2013.
  • [12] I. Adiri, J. Bruno, E. Frostig, A. H. G. Rinnooy Kan, “Single machine flow time scheduling with a single breakdown”, Acta Informatica, vol. 26, no. 7, pp. 679–696, 1989.
  • [13] F. Jin, J. N. Gupta, S. Song, C. Wu, “Single machine scheduling with sequence-dependent family setups to minimize maximum lateness”, Journal of the Operational Research Society, vol. 61, no. 7, pp. 1181-1189, 2010.
  • [14] A. Yurtkuran and E. Emel, “A discrete artificial bee colony algorithm for single machine scheduling problems”, International Journal of Production Research, vol. 54, no. 22, pp. 6860-6878, 2016.
  • [15] Y. Suppiah, and M. K. Omar, “A hybrid tabu search for batching and sequencing decisions in a single machine environment”, Computers & Industrial Engineering, vol. 78, pp. 135-147, 2014.
  • [16] M. T. Almeida, and M. Centeno, “A composite heuristic for the single machine early/tardy job scheduling problem”, Computers & Operations Research, vol. 25, no. 7-8, pp. 625–635, 1998.
  • [17] J. M. S Valente, and R. A. F. S. Alves, “Heuristics for The Single Machine Scheduling Problem with Quadratic Earliness and Tardiness Penalties”, Computers & Operational Research, vol. 35, pp. 3696–3713, 2008.
  • [18] F. Della Croce, and V. T'kindt, “A recovering beam search algorithm for the one-machine dynamic total completion time scheduling problem”, Journal of the Operational Research Society, vol. 53, no. 11, pp. 1275-1280, 2002.
  • [19] A. Jouglet, D. Savourey, J. Carlier, and P. Baptiste, “Dominance-based heuristics for one-machine total cost scheduling problems”, European Journal of Operational Research, vol. 184, no. 3, pp. 879-899, 2008.
  • [20] M. Vila, and J. Pereira, “Exact and heuristic procedures for single machine scheduling with quadratic earliness and tardiness penalties”, Computers & Operations Research, vol. 40, no. 7, pp. 1819-1828, 2013.
  • [21] F. Della Croce, F. Salassa, and V. T'kindt, “ A hybrid heuristic approach for single machine scheduling with release times”, Computers & Operations Research, vol. 45, pp. 7-11, 2014.
  • [22] R. M’Hallah, and A. Alhajraf, “Ant colony systems for the single-machine total weighted earliness tardiness scheduling problem”, Journal of Scheduling, vol. 19, no. 2, pp. 191-205, 2016.
  • [23] B. Yang, J. Geunes, and W. J. O'Brien, “A heuristic approach for minimizing weighted tardiness and overtime costs in single resource scheduling”, Computers & Operations Research, vol. 31, no. 8, pp. 1273-1301, 2004.
Toplam 23 adet kaynakça vardır.

Ayrıntılar

Birincil Dil İngilizce
Konular Endüstri Mühendisliği
Bölüm Makaleler
Yazarlar

Elifcan Göçmen

Onur Derse Bu kişi benim

Yayımlanma Tarihi 30 Haziran 2020
Kabul Tarihi 26 Mart 2020
Yayımlandığı Sayı Yıl 2020 Cilt: 4 Sayı: 1

Kaynak Göster

APA Göçmen, E., & Derse, O. (2020). A Tabu Search Algorithm for an Excavator Scheduling Problem. International Scientific and Vocational Studies Journal, 4(1), 1-11.
AMA Göçmen E, Derse O. A Tabu Search Algorithm for an Excavator Scheduling Problem. ISVOS. Haziran 2020;4(1):1-11.
Chicago Göçmen, Elifcan, ve Onur Derse. “A Tabu Search Algorithm for an Excavator Scheduling Problem”. International Scientific and Vocational Studies Journal 4, sy. 1 (Haziran 2020): 1-11.
EndNote Göçmen E, Derse O (01 Haziran 2020) A Tabu Search Algorithm for an Excavator Scheduling Problem. International Scientific and Vocational Studies Journal 4 1 1–11.
IEEE E. Göçmen ve O. Derse, “A Tabu Search Algorithm for an Excavator Scheduling Problem”, ISVOS, c. 4, sy. 1, ss. 1–11, 2020.
ISNAD Göçmen, Elifcan - Derse, Onur. “A Tabu Search Algorithm for an Excavator Scheduling Problem”. International Scientific and Vocational Studies Journal 4/1 (Haziran 2020), 1-11.
JAMA Göçmen E, Derse O. A Tabu Search Algorithm for an Excavator Scheduling Problem. ISVOS. 2020;4:1–11.
MLA Göçmen, Elifcan ve Onur Derse. “A Tabu Search Algorithm for an Excavator Scheduling Problem”. International Scientific and Vocational Studies Journal, c. 4, sy. 1, 2020, ss. 1-11.
Vancouver Göçmen E, Derse O. A Tabu Search Algorithm for an Excavator Scheduling Problem. ISVOS. 2020;4(1):1-11.


Creative Commons License
Creative Commons Atıf 4.0 It is licensed under an International License