Çok kriterli karar verme AHP Enerji yatırım planlaması Türkiye
The population growth of the countries, increasing living standards and technological developments cause people to become more energy dependent and cause to increase energy consumption. This situation increases the energy dependency of all countries day by day and each country should make its own energy planning taking into account its own energy resources and energy facts of the country. As a result of the surveys/interviews conducted with the energy managers working in Turkey’s public and private sectors; 6 main criteria and 31 related sub-criteria have been determined for the selection of 13 types of power plants planned to be constructed in Turkey. While planning/choosing power plants, the Analytical Hierarchy Process (AHP) is used as multi-criteria decision making method. For the solution Excel is used and Excel’s macros are written. In the light of the results, the reason for choosing the power plant is examined and the results are compared with the MENR’s year 2023 objectives/goals stated in “Energy Strategy” document.
Multi-criteria decision making AHP Energy investment planning Turkey
Birincil Dil | Türkçe |
---|---|
Bölüm | Makaleler |
Yazarlar | |
Yayımlanma Tarihi | 31 Aralık 2018 |
Yayımlandığı Sayı | Yıl 2018 Cilt: 33 Sayı: 4 |