When calculating the production cost of a product, two basic items are taken into consideration. The first is the material cost and the second is the labor cost. Material costs can be calculated very clearly due to the lack of personal judgment. Because the amount of material used for the production of that product is certain. However, the calculation of labor costs may not always be as simple and precise. The amount of product produced per unit time directly affects product costs. Therefore, to calculate the costs correctly, the number of parts produced per unit time must be calculated correctly. At this point, production times per product gain importance. It is not considered sufficient to use the values on the chronometer when calculating the production times of parts or products. Standard production times are calculated by adding performance and tolerance values to the chronometer values. Worker performance may vary from person to person. Performance varies depending on worker ability, effort, consistency and working environment. This difference in performance becomes very important in manual production processes. In automatic production processes, this difference is especially important when disassembling and assembly processes of the parts to the automatic machines. Tempo rating systems have been proposed to standardize worker performances and to minimize the negative effects of performance differences between individuals. The Classical Westinghouse Method is one of the common use tempo rating system. In the CWM, the performance of the worker is calculated by using skill, effort, environmental conditions, and consistency values. Evaluations of these four criteria are obtained by observing by decision-makers. In this study, the fuzzy rule-based Westinghouse method was developed because decision-makers use linguistic expressions to evaluate worker performance. The proposed Fuzzy Westinghouse Method is applied to a part of the company that produces automatic cutting machines in order to prove its validity. As a result of the study, it was determined that the proposed model produces more sensitive values.
Tempo rating system Classical Westinghouse method normal time fuzzy logic Fuzzy Westinghouse method
This paper is an extension of a conference paper entitled “Fuzzy Westinghouse Tempo Rating System: A Case Study in an Automotive Company” that published in Conference Proceedings of “10th International Symposium on Intelligent Manufacturing and Service Systems (IMSS’19)”.
When calculating the production cost of a product, two basic items are taken into consideration. The first is the material cost and the second is the labor cost. Material costs can be calculated very clearly due to the lack of personal judgment. Because the amount of material used for the production of that product is certain. However, the calculation of labor costs may not always be as simple and precise. The amount of product produced per unit time directly affects product costs. Therefore, to calculate the costs correctly, the number of parts produced per unit time must be calculated correctly. At this point, production times per product gain importance. It is not considered sufficient to use the values on the chronometer when calculating the production times of parts or products. Standard production times are calculated by adding performance and tolerance values to the chronometer values. Worker performance may vary from person to person. Performance varies depending on worker ability, effort, consistency and working environment. This difference in performance becomes very important in manual production processes. In automatic production processes, this difference is especially important when disassembling and assembly processes of the parts to the automatic machines. Tempo rating systems have been proposed to standardize worker performances and to minimize the negative effects of performance differences between individuals. The Classical Westinghouse Method is one of the common use tempo rating system. In the CWM, the performance of the worker is calculated by using skill, effort, environmental conditions, and consistency values. Evaluations of these four criteria are obtained by observing by decision-makers. In this study, the fuzzy rule-based Westinghouse method was developed because decision-makers use linguistic expressions to evaluate worker performance. The proposed Fuzzy Westinghouse Method is applied to a part of the company that produces automatic cutting machines in order to prove its validity. As a result of the study, it was determined that the proposed model produces more sensitive values.
Tempo derecelendirme sistemi Klasik Westinghouse Yöntemi Normal Zaman Bulanık Mantık Bulanık Westinghouse Yöntemi
Birincil Dil | İngilizce |
---|---|
Konular | Endüstri Mühendisliği |
Bölüm | Araştırma Makaleleri |
Yazarlar | |
Yayımlanma Tarihi | 30 Nisan 2021 |
Kabul Tarihi | 6 Şubat 2021 |
Yayımlandığı Sayı | Yıl 2021 Cilt: 32 Sayı: 1 |