THE EFFECT OF FIXED PRODUCTION SETUP COST ON INVENTORY OPTIMISATION UNDER PROCESS FLEXIBILITY

Yıl 2018, Cilt: 36 Sayı: 1, 117 - 139, 30.03.2018
https://doi.org/10.17065/huniibf.411134

Öz

Process
flexibility in manufacturing aims to produce different products at the same
production facility with the minimum setup cost. It is not possible to
completely eliminate the setup cost in most cases even if a high degree of
investment is made for process flexibility. In this study, a decision support
model accounting for fixed setup cost has been presented to make inventory
decisions in production systems that have process flexibility. Additionally,
under process flexibility, the effect of fixed setup cost on inventory
decisions has been investigated. In this context, process flexibility problem
with fixed setup cost has been modelled using Mixed Integer Linear Programming
approach. Numerical assessments have been done on three different production
systems (dedicated, two chain and flexible) by means of the proposed decision
support model. The results reveal the necessity of taking fixed setup cost into
account in decision support models for process flexibility problem.

Kaynakça

  • Akbalik, A., B. Penz, C. Rapine (2015), “Capacitated Lot Sizing Problems with Inventory Bounds”, Annals of Operations Research, 229(1), 1-18.
  • Andreou, S.A. (1990), “A Capital Budgeting Model for Product-Mix Flexibility”, Manufacturing and Operations Management, 3(1), 5-23.
  • Axsäter, S. (2006), Inventory Control (Vol. 90), Springer Science & Business Media, New York, USA.
  • Baker, K.R., P. Dixon, M.J. Magazine, E.A. Silver (1978), “An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints”, Management Science, 24(16), 1710-1720.
  • Browne, J., D. Dubois, K. Rathmill, S.P. Sethi, K.E. Stecke (1984), “Classification of Flexible Manufacturing Systems”, The FMS magazine, 2(2), 114-117.
  • Chao, X., B. Yang, Y. Xu (2012), “Dynamic Inventory and Pricing Policy in a Capacitated Stochastic Inventory System with Fixed Ordering Cost”, Operations Research Letters, 40(2), 99-107.
  • Chen, H.D., D.W. Hearn, C.Y. Lee (1994), “A New Dynamic Programming Algorithm for the Single Item Capacitated Dynamic Lot Size Model”, Journal of Global Optimization, 4(3), 285-300.
  • Chou, M.C., C.P. Teo, H. Zheng (2008), “Process Flexibility: Design, Evaluation, and Applications”, Flexible Services and Manufacturing Journal, 20, 59-94.
  • Çimen, M., S. Belbağ (2015), “Süreç Esnekliği Varsayımı Altında Stokastik Stok Optimizasyonu Probleminin Dinamik Programlama ile Çözümü”, Gazi İktisadi ve İdari Bilimler Fakültesi Dergisi, 17(3), 255-270.
  • Çimen, M., S. Belbağ, M. Soysal (2016), “Üretimde Esneklik ve Stok Yönetimi: Stok Optimizasyonu İçin Bir Karar Destek Modeli”, İşletme Araştırmaları Dergisi, 8(1), 360-379.
  • Çimen, M., C. Kirkbride (2017), “Approximate Dynamic Programming Algorithms for Multidimensional Flexible Production-Inventory Problems.”, International Journal of Production Research, 55(7), 2034-2050.
  • Dennis, Z.Y., S.Y. Tang, J. Niederhoff (2011), On the Benefits of Operational Flexibility in a Distribution Network with Transshipment. Omega, 39(3), 350-361.
  • Diaby, M., H.C. Bahl, M.H. Karwan, S. Zionts (1992), “A Lagrangean Relaxation Approach for Very-Large-Scale Capacitated Lot-Sizing”, Management Science, 38(9), 1329-1340.
  • Fine, C.H., R.M. Freund (1990), “Optimal Investment in Product-Flexible Manufacturing Capacity”, Management Science, 36 (4), 449-466.
  • Gallego, G., A. Scheller-Wolf (2000), "Capacitated Inventory Problems with Fixed Order Costs: Some Optimal Policy Structure", European Journal of Operational Research, 126(3), 603-613.
  • Gustavson, Sten-Olof (1984), “Flexibility and Productivity in Complex Production Processes”, International Journal of Production Research, 22(5), 801-808.
  • He, P., Z. Chen, X. Xu (2011), “On Flexibility Investment in Manufacturing System: A Multi-Objective Decision Making Method”, Expert Systems with Applications, 38(9), 11813-11819.
  • Jaikumar, R. (1984), “Flexible Manufacturing Systems: A Managerial Perspective”, Harvard Business School, (Boston, MA), Jain, A., P.K. Jain, F.T.S. Chan, S. Singh (2013), “A Review on Manufacturing Flexibility”, International Journal of Production Research, 51(19), 5946–5970.
  • Jordan, W.C., S.C. Graves (1995), “Principles on the Benefits of Manufacturing Process Flexibility”, Management Sciences, 41(4), 577- 594.
  • Kleintje-Ell, F., G.P. Kiesmüller (2015), “Cost Minimising Order Schedules for a Capacitated Inventory System”, Annals of Operations Research, 229(1), 501-520.
  • Mandelbanm, M., J. Buzacott (1986), “Flexibility and Its Use: A Formal Decision Process and Manufacturing View”, Stecke, K.E. & Suri, R (der.) Proceedings of the Second ORSA/TIMS Conference on FMS (Ann Arbor, MI), Elsevier, Amsterdam, 119-130.
  • Özer, Ö., W. Wei (2004), “Inventory Control with Limited Capacity and Advance Demand Information”, Operations Research, 52(6), 988-1000.
  • Porteus, E.L. (1985), “Investing in Reduced Setups in The EOQ Model”, Management Science, 31(8), 998-1010.
  • Rao, U.S., J.M. Swaminathan, J. Zhang (2004), “Multi-Product Inventory Planning with Downward Substitution, Stochastic Demand and Setup Costs”, IIE Transactions, 36(1), 59-71.
  • Sethi, A.K., S.P. Sethi (1990), “Flexibility in Manufacturing: A Survey”, The International Journal of Flexible Manufacturing Systems, 2, 289-328. Shaoxiang, C. (2004), “The İnfinite Horizon Periodic Review Problem with Setup Costs and Capacity Constraints: A Partial Characterization of the Optimal Policy”, Operations Research, 52(3), 409-421.
  • Shaw, D.X., A.P. Wagelmans (1998), “An Algorithm for Single-Item Capacitated Economic Lot Sizing with Piecewise Linear Production Costs and General Holding Costs”, Management Science, 44(6), 831-838.
  • Shi, C., H. Zhang, X. Chao, R. Levi (2014), “Approximation Algorithms for Capacitated Stochastic Inventory Systems with Setup Costs”, Naval Research Logistics (NRL), 61(4), 304-319.
  • Son, Y.K., C.S. Park (1987), “Economic Measure of Productivity, Quality and Flexibility in Advanced Manufacturing Systems”, Journal of Manufacturing Systems, 6(3), 193-207.
  • Waters, D. (2003), Inventory Control and Management, John Wiley & Sons, Chichester, England.

SABİT ÜRETİM HAZIRLIK MALİYETİNİN SÜREÇ ESNEKLİĞİNDE STOK OPTİMİZASYONUNA ETKİSİ

Yıl 2018, Cilt: 36 Sayı: 1, 117 - 139, 30.03.2018
https://doi.org/10.17065/huniibf.411134

Öz

Üretimde
süreç esnekliği, farklı ürünlerin minimum hazırlık maliyetiyle aynı üretim
tesisinde üretilmesini hedeflemektedir. Sabit üretim hazırlık maliyetinin
tamamen ortadan kalkması süreç esnekliği için yüksek seviyede yatırım yapılsa
bile, pek çok durumda mümkün değildir. Bu çalışmada, süreç esnekliğine sahip
sistemlerde stok kararlarının verilmesi için sabit hazırlık maliyetlerini
dikkate alan bir karar destek modeli sunulmuş ve sabit hazırlık maliyetlerinin
süreç esnekliğinde stok kararlarına etkisi araştırılmıştır. Bu çerçevede süreç
esnekliği problemi sabit hazırlık maliyeti göz önünde bulundurularak, karma tam
sayılı doğrusal programlama yöntemiyle modellenmiştir. Geliştirilen bu karar
destek modeli kullanılarak esnek olmayan, ikili zincir tasarımlı ve tam esnek
olmak üzere üç farklı üretim sistemi üzerinde değerlendirmeler yapılmıştır.
Elde edilen sonuçlar süreç esnekliği problemi için geliştirilen karar destek
modellerinde sabit üretim hazırlık maliyetinin göz önünde bulundurulmasının
gerekliliğini ortaya çıkarmaktadır.

 

Kaynakça

  • Akbalik, A., B. Penz, C. Rapine (2015), “Capacitated Lot Sizing Problems with Inventory Bounds”, Annals of Operations Research, 229(1), 1-18.
  • Andreou, S.A. (1990), “A Capital Budgeting Model for Product-Mix Flexibility”, Manufacturing and Operations Management, 3(1), 5-23.
  • Axsäter, S. (2006), Inventory Control (Vol. 90), Springer Science & Business Media, New York, USA.
  • Baker, K.R., P. Dixon, M.J. Magazine, E.A. Silver (1978), “An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints”, Management Science, 24(16), 1710-1720.
  • Browne, J., D. Dubois, K. Rathmill, S.P. Sethi, K.E. Stecke (1984), “Classification of Flexible Manufacturing Systems”, The FMS magazine, 2(2), 114-117.
  • Chao, X., B. Yang, Y. Xu (2012), “Dynamic Inventory and Pricing Policy in a Capacitated Stochastic Inventory System with Fixed Ordering Cost”, Operations Research Letters, 40(2), 99-107.
  • Chen, H.D., D.W. Hearn, C.Y. Lee (1994), “A New Dynamic Programming Algorithm for the Single Item Capacitated Dynamic Lot Size Model”, Journal of Global Optimization, 4(3), 285-300.
  • Chou, M.C., C.P. Teo, H. Zheng (2008), “Process Flexibility: Design, Evaluation, and Applications”, Flexible Services and Manufacturing Journal, 20, 59-94.
  • Çimen, M., S. Belbağ (2015), “Süreç Esnekliği Varsayımı Altında Stokastik Stok Optimizasyonu Probleminin Dinamik Programlama ile Çözümü”, Gazi İktisadi ve İdari Bilimler Fakültesi Dergisi, 17(3), 255-270.
  • Çimen, M., S. Belbağ, M. Soysal (2016), “Üretimde Esneklik ve Stok Yönetimi: Stok Optimizasyonu İçin Bir Karar Destek Modeli”, İşletme Araştırmaları Dergisi, 8(1), 360-379.
  • Çimen, M., C. Kirkbride (2017), “Approximate Dynamic Programming Algorithms for Multidimensional Flexible Production-Inventory Problems.”, International Journal of Production Research, 55(7), 2034-2050.
  • Dennis, Z.Y., S.Y. Tang, J. Niederhoff (2011), On the Benefits of Operational Flexibility in a Distribution Network with Transshipment. Omega, 39(3), 350-361.
  • Diaby, M., H.C. Bahl, M.H. Karwan, S. Zionts (1992), “A Lagrangean Relaxation Approach for Very-Large-Scale Capacitated Lot-Sizing”, Management Science, 38(9), 1329-1340.
  • Fine, C.H., R.M. Freund (1990), “Optimal Investment in Product-Flexible Manufacturing Capacity”, Management Science, 36 (4), 449-466.
  • Gallego, G., A. Scheller-Wolf (2000), "Capacitated Inventory Problems with Fixed Order Costs: Some Optimal Policy Structure", European Journal of Operational Research, 126(3), 603-613.
  • Gustavson, Sten-Olof (1984), “Flexibility and Productivity in Complex Production Processes”, International Journal of Production Research, 22(5), 801-808.
  • He, P., Z. Chen, X. Xu (2011), “On Flexibility Investment in Manufacturing System: A Multi-Objective Decision Making Method”, Expert Systems with Applications, 38(9), 11813-11819.
  • Jaikumar, R. (1984), “Flexible Manufacturing Systems: A Managerial Perspective”, Harvard Business School, (Boston, MA), Jain, A., P.K. Jain, F.T.S. Chan, S. Singh (2013), “A Review on Manufacturing Flexibility”, International Journal of Production Research, 51(19), 5946–5970.
  • Jordan, W.C., S.C. Graves (1995), “Principles on the Benefits of Manufacturing Process Flexibility”, Management Sciences, 41(4), 577- 594.
  • Kleintje-Ell, F., G.P. Kiesmüller (2015), “Cost Minimising Order Schedules for a Capacitated Inventory System”, Annals of Operations Research, 229(1), 501-520.
  • Mandelbanm, M., J. Buzacott (1986), “Flexibility and Its Use: A Formal Decision Process and Manufacturing View”, Stecke, K.E. & Suri, R (der.) Proceedings of the Second ORSA/TIMS Conference on FMS (Ann Arbor, MI), Elsevier, Amsterdam, 119-130.
  • Özer, Ö., W. Wei (2004), “Inventory Control with Limited Capacity and Advance Demand Information”, Operations Research, 52(6), 988-1000.
  • Porteus, E.L. (1985), “Investing in Reduced Setups in The EOQ Model”, Management Science, 31(8), 998-1010.
  • Rao, U.S., J.M. Swaminathan, J. Zhang (2004), “Multi-Product Inventory Planning with Downward Substitution, Stochastic Demand and Setup Costs”, IIE Transactions, 36(1), 59-71.
  • Sethi, A.K., S.P. Sethi (1990), “Flexibility in Manufacturing: A Survey”, The International Journal of Flexible Manufacturing Systems, 2, 289-328. Shaoxiang, C. (2004), “The İnfinite Horizon Periodic Review Problem with Setup Costs and Capacity Constraints: A Partial Characterization of the Optimal Policy”, Operations Research, 52(3), 409-421.
  • Shaw, D.X., A.P. Wagelmans (1998), “An Algorithm for Single-Item Capacitated Economic Lot Sizing with Piecewise Linear Production Costs and General Holding Costs”, Management Science, 44(6), 831-838.
  • Shi, C., H. Zhang, X. Chao, R. Levi (2014), “Approximation Algorithms for Capacitated Stochastic Inventory Systems with Setup Costs”, Naval Research Logistics (NRL), 61(4), 304-319.
  • Son, Y.K., C.S. Park (1987), “Economic Measure of Productivity, Quality and Flexibility in Advanced Manufacturing Systems”, Journal of Manufacturing Systems, 6(3), 193-207.
  • Waters, D. (2003), Inventory Control and Management, John Wiley & Sons, Chichester, England.
Toplam 29 adet kaynakça vardır.

Ayrıntılar

Birincil Dil Türkçe
Bölüm Hacettepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi
Yazarlar

Mehmet Soysal

Mustafa Çimen

Sedat Belbağ

Yayımlanma Tarihi 30 Mart 2018
Gönderilme Tarihi 30 Mart 2016
Yayımlandığı Sayı Yıl 2018 Cilt: 36 Sayı: 1

Kaynak Göster

APA Soysal, M., Çimen, M., & Belbağ, S. (2018). SABİT ÜRETİM HAZIRLIK MALİYETİNİN SÜREÇ ESNEKLİĞİNDE STOK OPTİMİZASYONUNA ETKİSİ. Hacettepe Üniversitesi İktisadi Ve İdari Bilimler Fakültesi Dergisi, 36(1), 117-139. https://doi.org/10.17065/huniibf.411134
AMA Soysal M, Çimen M, Belbağ S. SABİT ÜRETİM HAZIRLIK MALİYETİNİN SÜREÇ ESNEKLİĞİNDE STOK OPTİMİZASYONUNA ETKİSİ. Hacettepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi. Mart 2018;36(1):117-139. doi:10.17065/huniibf.411134
Chicago Soysal, Mehmet, Mustafa Çimen, ve Sedat Belbağ. “SABİT ÜRETİM HAZIRLIK MALİYETİNİN SÜREÇ ESNEKLİĞİNDE STOK OPTİMİZASYONUNA ETKİSİ”. Hacettepe Üniversitesi İktisadi Ve İdari Bilimler Fakültesi Dergisi 36, sy. 1 (Mart 2018): 117-39. https://doi.org/10.17065/huniibf.411134.
EndNote Soysal M, Çimen M, Belbağ S (01 Mart 2018) SABİT ÜRETİM HAZIRLIK MALİYETİNİN SÜREÇ ESNEKLİĞİNDE STOK OPTİMİZASYONUNA ETKİSİ. Hacettepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi 36 1 117–139.
IEEE M. Soysal, M. Çimen, ve S. Belbağ, “SABİT ÜRETİM HAZIRLIK MALİYETİNİN SÜREÇ ESNEKLİĞİNDE STOK OPTİMİZASYONUNA ETKİSİ”, Hacettepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi, c. 36, sy. 1, ss. 117–139, 2018, doi: 10.17065/huniibf.411134.
ISNAD Soysal, Mehmet vd. “SABİT ÜRETİM HAZIRLIK MALİYETİNİN SÜREÇ ESNEKLİĞİNDE STOK OPTİMİZASYONUNA ETKİSİ”. Hacettepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi 36/1 (Mart 2018), 117-139. https://doi.org/10.17065/huniibf.411134.
JAMA Soysal M, Çimen M, Belbağ S. SABİT ÜRETİM HAZIRLIK MALİYETİNİN SÜREÇ ESNEKLİĞİNDE STOK OPTİMİZASYONUNA ETKİSİ. Hacettepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi. 2018;36:117–139.
MLA Soysal, Mehmet vd. “SABİT ÜRETİM HAZIRLIK MALİYETİNİN SÜREÇ ESNEKLİĞİNDE STOK OPTİMİZASYONUNA ETKİSİ”. Hacettepe Üniversitesi İktisadi Ve İdari Bilimler Fakültesi Dergisi, c. 36, sy. 1, 2018, ss. 117-39, doi:10.17065/huniibf.411134.
Vancouver Soysal M, Çimen M, Belbağ S. SABİT ÜRETİM HAZIRLIK MALİYETİNİN SÜREÇ ESNEKLİĞİNDE STOK OPTİMİZASYONUNA ETKİSİ. Hacettepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi. 2018;36(1):117-39.

Dergiye yayımlanmak üzere gönderilecek yazılar Dergi'nin son sayfasında ve Dergi web sistesinde yer alan Yazar Rehberi'ndeki kurallara uygun olmalıdır.


Gizlilik Beyanı

Bu dergi sitesindeki isimler ve e-posta adresleri sadece bu derginin belirtilen amaçları doğrultusunda kullanılacaktır; farklı herhangi bir amaç için veya diğer kişilerin kullanımına açılmayacaktır.