Transportation
planning process, which requires a multi-criteria decision making a very
specific decision, is one of the most important issues of metropolitan cities.
There are many projects in the field of rail systems in Istanbul and some of
these projects are monorail projects. Through this way, urban transportation is
supported by various types of public transportation. However, it is not
possible to allocate the resources to all projects at the same time. This is
affected by several criteria, especially by limited budgetary constraints. In
this study, monorail projects were evaluated in accordance with urban needs of Istanbul and the planning
was done under three different budget scenarios. The analytic hierarchy process
(AHP) was used in the evaluation process of the projects and the goal
programming (GP) model was used for the selection process. As a result, the
selection of the monorail projects planned for Istanbul was made.
Birincil Dil | İngilizce |
---|---|
Bölüm | Research Articles |
Yazarlar | |
Yayımlanma Tarihi | 15 Ağustos 2018 |
Gönderilme Tarihi | 6 Mart 2018 |
Kabul Tarihi | 18 Nisan 2018 |
Yayımlandığı Sayı | Yıl 2018 Cilt: 2 Sayı: 2 |