Year 2018,
Volume: 4 Issue: 2, 108 - 114, 27.06.2018
Akın Aras
Murat Ayaz
,
Engin Özdemir
,
Nurettin Abut
References
- S. Alçın, “Endüstri 4.0 ve İnsan Kaynakları”, Popüler Yönetim Dergisi, vol. 63, p. 47, 2016.
- T. Stock, G. Seliger, “Opportunities of Sustainable Manufacturing in Industry 4.0”, Procedia CIRP, vol. 40, ss. 536-541, December 2016.
- Plattform Industrie 4.0, Recommendations for Implementing the strategic ınitiative INDUSTRIE 4.0 -Final report of the Industrie 4.0 Working Group, Acatech, April 2013.
- P. Puntel-Schmidt, A. Fay, “Levels of Detail and Appropriate Model Types for Virtual Commissioning in Manufacturing Engineering”, IFAC-PapersOnLine, vol. 48-1, pp. 922-927, February 2015.
- http://www.whoinventedfirst.com/invented-steamengine/
- http://www.bilgibaba.org/yazi/elektrik-motoru-nedirnasil-calisir
- https://w3.siemens.com/mcms/programmable-logiccontroller/en/advanced-controller/pages/default_alt.aspx
- S. Ninan, B. Gangula, M. von Alten, B. Snidermann, “Who owns the road? The IoT-connected car of today and tomorow”, Deloitte University Press, August 2015.
- https://www.semiwiki.com/forum/content/6341-industry-4-0-manufacturing-processes.html
- https://www.bcg.com/publications/2015/technology-business-transformation-engineered-productsinfrastructure-man-machine-industry-4.aspx
- R. Geissbauer, J. Vedso, S. Schrauf, “Industry 4.0: Building the digital enterprise”, www.pwc.com/industry40, April 2016.
- M. F. Zäh, G. Wünsch, “Schnelle Inbetriebnahme von Produktionssystemen”, wt Werkstattstechnik online, vol. 95, pp. 699-704, September 2005.
- M. F. Zäh, G. Wünsch, T. Hensel, A. Lindworsky, “Nutzen der virtuellen Inbetriebnahme: Ein experiment - Use of virtual commissioning: An experiment”, ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, vol. 101, pp. 595-599, October 2006.
- P. Hoffmann, R. Schumann, T. Maksoud, G. Premier, “Virtual Commissioning of Manufacturing Systems: A Review and New Approaches for
Simplification”, 24th European Conference on Modelling and Simulation, Kuala Lumpur, pp. 175-181, 01-04 June 2010.
- https://www.cardsplmsolutions.nl/en/plmsoftware/tecnomatix/process-simulate-23/screenshots
- https://www.plm.automation.siemens.com/en/products/tecnomatix/manufacturingsimulation/assembly/process-simulate.shtml
- L. Guerrero, V. López, J. Mejía, “Virtual Commissioning with Process Simulation (Tecnomatix)”, Computer-Aided Design and
Applications, vol. 11, pp. 11-19, July 2014.
- https://www.usgamer.net/articles/htc-vive-virtualreality-systemdeluxe-audio-strap-549-black-friday-sale.
Investigation on Industry 4.0 and Virtual Commissioning
Year 2018,
Volume: 4 Issue: 2, 108 - 114, 27.06.2018
Akın Aras
Murat Ayaz
,
Engin Özdemir
,
Nurettin Abut
Abstract
The human being had been busy with mostly agricultural economy for a
long history when the steam was considered as a resource of kinetic energy.
Using the steam machine in textile industry for the first time in the UK at the
beginning of the 18th century, would be called as “Industrial Revolution” many
decades later. Respectively, second industrial revolution with the invention
and utilizing of electricity, then third industrial revolution with the rise of
electronics and automation followed this period. And today, we have been facing
with the fourth industrial revolution via internet of things, augmented
reality, learning machines, etc. One of the key technologies that are improved
in this period is virtual commissioning. The aim of this contribution is to
suggest a definition to the Industry 4.0 with its historical precursors, and to
give a focus on virtual commissioning technology as an output of the fourth
industrial revolution.
References
- S. Alçın, “Endüstri 4.0 ve İnsan Kaynakları”, Popüler Yönetim Dergisi, vol. 63, p. 47, 2016.
- T. Stock, G. Seliger, “Opportunities of Sustainable Manufacturing in Industry 4.0”, Procedia CIRP, vol. 40, ss. 536-541, December 2016.
- Plattform Industrie 4.0, Recommendations for Implementing the strategic ınitiative INDUSTRIE 4.0 -Final report of the Industrie 4.0 Working Group, Acatech, April 2013.
- P. Puntel-Schmidt, A. Fay, “Levels of Detail and Appropriate Model Types for Virtual Commissioning in Manufacturing Engineering”, IFAC-PapersOnLine, vol. 48-1, pp. 922-927, February 2015.
- http://www.whoinventedfirst.com/invented-steamengine/
- http://www.bilgibaba.org/yazi/elektrik-motoru-nedirnasil-calisir
- https://w3.siemens.com/mcms/programmable-logiccontroller/en/advanced-controller/pages/default_alt.aspx
- S. Ninan, B. Gangula, M. von Alten, B. Snidermann, “Who owns the road? The IoT-connected car of today and tomorow”, Deloitte University Press, August 2015.
- https://www.semiwiki.com/forum/content/6341-industry-4-0-manufacturing-processes.html
- https://www.bcg.com/publications/2015/technology-business-transformation-engineered-productsinfrastructure-man-machine-industry-4.aspx
- R. Geissbauer, J. Vedso, S. Schrauf, “Industry 4.0: Building the digital enterprise”, www.pwc.com/industry40, April 2016.
- M. F. Zäh, G. Wünsch, “Schnelle Inbetriebnahme von Produktionssystemen”, wt Werkstattstechnik online, vol. 95, pp. 699-704, September 2005.
- M. F. Zäh, G. Wünsch, T. Hensel, A. Lindworsky, “Nutzen der virtuellen Inbetriebnahme: Ein experiment - Use of virtual commissioning: An experiment”, ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, vol. 101, pp. 595-599, October 2006.
- P. Hoffmann, R. Schumann, T. Maksoud, G. Premier, “Virtual Commissioning of Manufacturing Systems: A Review and New Approaches for
Simplification”, 24th European Conference on Modelling and Simulation, Kuala Lumpur, pp. 175-181, 01-04 June 2010.
- https://www.cardsplmsolutions.nl/en/plmsoftware/tecnomatix/process-simulate-23/screenshots
- https://www.plm.automation.siemens.com/en/products/tecnomatix/manufacturingsimulation/assembly/process-simulate.shtml
- L. Guerrero, V. López, J. Mejía, “Virtual Commissioning with Process Simulation (Tecnomatix)”, Computer-Aided Design and
Applications, vol. 11, pp. 11-19, July 2014.
- https://www.usgamer.net/articles/htc-vive-virtualreality-systemdeluxe-audio-strap-549-black-friday-sale.