In this study, a risk assessment was
performed by Fine-Kinney method in various units of an official institutional
laboratory. For this purpose, feasibility of the laboratory determinated,
devices and areas with high risk priority were identified. In hazardous areas, High-risk materials
such as store chemical material, spare part production, molding and pressing,
rubber production and shredding, plastic breaking, deburring, cutting and
packaging, plastic injection molding machines used. The risks identified in
these units can be stated as follows; injury by exposure to chemical materials,
diarthrosis and spinal cord injury, limb loss, hearing loss, etc. In these
units, the risk assessment was carried out by the Fine Kinney method and
necessary precautions were taken and necessary arrangements were made. These
measures are applying the control protocol for routine execution of the
process, training of personnel for each unit
according to ISG rules and giving training seminars at regular intervals,
protective clothing and equipment used during operation, regular maintenance
and repairs of units. After these precautions, "risk
acceptable" values are obtained by carrying out risk preventive activities
in regions with the highest risk.
Primary Language | English |
---|---|
Journal Section | Articles |
Authors | |
Publication Date | August 6, 2018 |
Submission Date | July 24, 2018 |
Acceptance Date | August 2, 2018 |
Published in Issue | Year 2018 Volume: 1 Issue: 1 |