Direct labor cost volume variance in success measurement and an application

Yıl 2022, Cilt: 4 Sayı: 1, 1 - 5, 30.06.2022
https://doi.org/10.47542/sauied.915234

Öz

It is possible to benefit from the variance analysis used in the enterprises, where the standard cost system is implemented in order to apply the management principle according to the exceptions, in success (performance) measurements. While using variance analysis in success measurement, the effects of activity and top management on the characteristics of the production type in the enterprise and the results of the production activity should be examined.
In this study, it is revealed that in businesses with certain production characteristics, the top management should also be responsible for the direct labor time variance, which has been held under the responsibility of the activity management until today, and that the management of the activity will not be objective in all of the time variance (Martin, J., 2018) In the study, the responsibility of the top management on direct labor time variance is explained with a new concept called "direct labor cost volume variance"

Kaynakça

  • Anthony, Welsh & Reece (1985). Management Accounting, 4th Edition, Homewood, Illinois: Richard D. Irwin Inc., 1985. Bacon, R., & Kojima, M. (2011). Issues in Estimating the Employment Generated by Energy Sector Activities.

Başarı ölçümünde direkt işçilik maliyeti hacim farkı ve bir uygulama

Yıl 2022, Cilt: 4 Sayı: 1, 1 - 5, 30.06.2022
https://doi.org/10.47542/sauied.915234

Öz

Standart maliyet sistemini uygulayan işlemeler açısından istisnalara göre yönetim ilkesinin uygulanabilmesi için kullanılan sapma analizlerinden, başarı (performans) ölçümlerinde de yararlanmak mümkündür. Başarı ölçümünde sapma analizlerinden yararlanırken, işletmedeki üretim şeklinin karakteristiği ve üretim faaliyetinin sonuçları üzerinde faaliyet ve tepe yönetiminin etkilerinin incelenmesi gerekmektedir.
Bu çalışmada, belirli bir üretim şekli karakteristiği taşıyan işletmelerde, bugüne kadar faaliyet yönetiminin sorumluluğu altında tutulan direkt işçilik zaman sapması üzerinde, tepe yönetiminin de sorumluluk taşıması gerektiği ve bu özellikteki işletmelerde, zaman sapmasının tümünden faaliyet yönetiminin sorumlu tutulmasının objektif olmayacağı ortaya konmaktadır. Çalışmada, direkt işçilik zaman sapması üzerinde tepe yönetiminin sorumluluğu, yeni bir kavramla, “direkt işçilik maliyeti hacim sapması” kavramı ile açıklanmaktadır.

Kaynakça

  • Anthony, Welsh & Reece (1985). Management Accounting, 4th Edition, Homewood, Illinois: Richard D. Irwin Inc., 1985. Bacon, R., & Kojima, M. (2011). Issues in Estimating the Employment Generated by Energy Sector Activities.
Toplam 1 adet kaynakça vardır.

Ayrıntılar

Birincil Dil İngilizce
Konular İşletme
Bölüm Araştırma Makaleleri
Yazarlar

Selim Yüksel Pazarçeviren 0000-0001-8198-4424

Duygu Celayir 0000-0002-1435-3910

Yayımlanma Tarihi 30 Haziran 2022
Yayımlandığı Sayı Yıl 2022 Cilt: 4 Sayı: 1

Kaynak Göster

APA Pazarçeviren, S. Y., & Celayir, D. (2022). Direct labor cost volume variance in success measurement and an application. Sakarya Üniversitesi İşletme Enstitüsü Dergisi, 4(1), 1-5. https://doi.org/10.47542/sauied.915234
AMA Pazarçeviren SY, Celayir D. Direct labor cost volume variance in success measurement and an application. Sakarya Üniversitesi İşletme Enstitüsü Dergisi. Haziran 2022;4(1):1-5. doi:10.47542/sauied.915234
Chicago Pazarçeviren, Selim Yüksel, ve Duygu Celayir. “Direct Labor Cost Volume Variance in Success Measurement and an Application”. Sakarya Üniversitesi İşletme Enstitüsü Dergisi 4, sy. 1 (Haziran 2022): 1-5. https://doi.org/10.47542/sauied.915234.
EndNote Pazarçeviren SY, Celayir D (01 Haziran 2022) Direct labor cost volume variance in success measurement and an application. Sakarya Üniversitesi İşletme Enstitüsü Dergisi 4 1 1–5.
IEEE S. Y. Pazarçeviren ve D. Celayir, “Direct labor cost volume variance in success measurement and an application”, Sakarya Üniversitesi İşletme Enstitüsü Dergisi, c. 4, sy. 1, ss. 1–5, 2022, doi: 10.47542/sauied.915234.
ISNAD Pazarçeviren, Selim Yüksel - Celayir, Duygu. “Direct Labor Cost Volume Variance in Success Measurement and an Application”. Sakarya Üniversitesi İşletme Enstitüsü Dergisi 4/1 (Haziran 2022), 1-5. https://doi.org/10.47542/sauied.915234.
JAMA Pazarçeviren SY, Celayir D. Direct labor cost volume variance in success measurement and an application. Sakarya Üniversitesi İşletme Enstitüsü Dergisi. 2022;4:1–5.
MLA Pazarçeviren, Selim Yüksel ve Duygu Celayir. “Direct Labor Cost Volume Variance in Success Measurement and an Application”. Sakarya Üniversitesi İşletme Enstitüsü Dergisi, c. 4, sy. 1, 2022, ss. 1-5, doi:10.47542/sauied.915234.
Vancouver Pazarçeviren SY, Celayir D. Direct labor cost volume variance in success measurement and an application. Sakarya Üniversitesi İşletme Enstitüsü Dergisi. 2022;4(1):1-5.